[#XCI-6] Verify integration process for a new SP resource
Status:
Closed
Project:
XSEDE Cyberinfrastructure Integration
Component/s:
Community Software Repository (CSR)
Fix Version/s:
PY6 Increment A (Sep - Dec '16)
Type:
XCI Engineering Analysis
Priority:
Major
Reporter:
JP Navarro
Assignee:
Shava Smallen
Resolution:
Unresolved
Votes:
0
Issue Links:
Associated bugs and stories
associated with
XCI-208
Document and address SP IPF integrati...
Closed
Review
has review
REVIEW-31
XCI-6 Verify integration process for ...
Closed
XCI Test Recommendations
has test recommendation(s)
XCI-293
Improve IPF configure script
Closed
has test recommendation(s)
XCI-294
Clarify XCDB REST API instructions in...
Proposed
has test recommendation(s)
XCI-285
Improve SP Checklist to display recom...
Proposed
has test recommendation(s)
XCI-290
Improve fetch-crl configuration instr...
Proposed
has test recommendation(s)
XCI-291
Improve xdresourceid installation ins...
Proposed
has test recommendation(s)
XCI-287
Provide instructions for how to gener...
Cancelled
has test recommendation(s)
XCI-292
Replace grid-proxy-init instructions ...
Cancelled
has test recommendation(s)
XCI-296
Add CentOS 6 package prerequisites fo...
Cancelled
has test recommendation(s)
XCI-286
Review all package installation docum...
Backlog
has test recommendation(s)
XCI-295
Provide a CUE template
Proposed
Target Operator:
XSEDE Community Infrastructure , XSEDE Service Providers
XSEDE Priority:
-
Discussion Thread:
https://www.xsede.org/web/staff/staff-message-board/-/message_boards/category/1284459
Public activity link:
https://software.xsede.org/display/xci-6
Devel Repository:
Show
https://software.xsede.org/svn/xci/activities/xci-006/trunk/
Use Cases:
SPI-01: Resource integration console
Effort and Costs:
Staff Name (Lastname, Firstname)
Effort (person weeks)
Roles or Contributions
Smallen, Shava
1
1 week of effort to lead and implement the activity (required)
Navarro, JP
.2
one day of effort to help review test plan
Hazlewood, Victor
2
two weeks of effort to help review test plan and aid testers
Irving, Christopher
2
two weeks of SP testing
Deliverables:
Activity Deliverable
Assignee
Detail
Test Plan
Shava, Victor, JP
Test plan for how to verify SP resource integration
Test Report
Shava
Summary and recommendations for how to improve SP resource integration
Planned Launch Date:
08/19/2016
Actual Launch Date:
08/22/2016
Planned Test Readiness Review Date:
08/22/2016
Actual Test Readiness Review Date:
09/22/2016
Planned Complete Date:
09/30/2016
Actual Complete Date:
12/05/2017
Activity Lead:
Shava Smallen
Lead Tester:
Shava Smallen
Testers:
Christopher Irving
Test Plan:
https://software.xsede.org/svn/xci/activities/xci-006/trunk/Deliverables/XCI-6-TestingPlan.pdf
TRR Baseline:
https://software.xsede.org/svn/xci/activities/xci-006/tags/TRR
Test Report:
https://docs.google.com/a/ucsd.edu/document/d/1vZwJKW9gR6i8euvhtY3JoYDUPzSTDr2TkFcqtmae_Mg/edit?usp=sharing
This is an evaluation and testing activity to analyze the current process of integrating a new resource. We will create a new virtual cluster on Comet and run through the current steps to both introduce a new Level1 Service Provider and a new resource and document everything that is complicated, confusing, or didn’t work and how it can be improved. We are looking for feedback on both the overall integration process and on the integration of individual components.
There are comments for XCI-6 that can be viewed with XSEDE authentication.