JIRA Issue

[#XCI-6] Verify integration process for a new SP resource

[XCI-6] Verify integration process for a new SP resource Created: 08/16/2016  Updated: 07/25/2018

Status: Closed
Project: XSEDE Cyberinfrastructure Integration
Component/s: Community Software Repository (CSR)
Fix Version/s: PY6 Increment A (Sep - Dec '16)

Type: XCI Engineering Analysis Priority: Major
Reporter: JP Navarro Assignee: Shava Smallen
Resolution: Unresolved Votes: 0

Issue Links:
Associated bugs and stories
associated with XCI-208 Document and address SP IPF integrati... Closed
Review
has review REVIEW-31 XCI-6 Verify integration process for ... Closed
XCI Test Recommendations
has test recommendation(s) XCI-294 Clarify XCDB REST API instructions in... Proposed
has test recommendation(s) XCI-285 Improve SP Checklist to display recom... Proposed
has test recommendation(s) XCI-286 Review all package installation docum... Proposed
has test recommendation(s) XCI-287 Provide instructions for how to gener... Proposed
has test recommendation(s) XCI-290 Improve fetch-crl configuration instr... Proposed
has test recommendation(s) XCI-291 Improve xdresourceid installation ins... Proposed
has test recommendation(s) XCI-292 Replace grid-proxy-init instructions ... Proposed
has test recommendation(s) XCI-293 Improve IPF configure script Proposed
has test recommendation(s) XCI-296 Add CentOS 6 package prerequisites fo... Proposed
has test recommendation(s) XCI-295 Provide a CUE template Proposed
Target Operator:
XSEDE Community Infrastructure, XSEDE Service Providers
XSEDE Priority: -
Discussion Thread: https://www.xsede.org/web/staff/staff-message-board/-/message_boards/category/1284459
Public activity link: https://software.xsede.org/display/xci-6
Devel Repository: https://software.xsede.org/svn/xci/activities/xci-006/trunk/
Use Cases:
SPI-01: Resource integration console
Effort and Costs:
Staff Name (Lastname, Firstname) Effort (person weeks) Roles or Contributions
Smallen, Shava 1 1 week of effort to lead and implement the activity (required)
Navarro, JP .2 one day of effort to help review test plan
Hazlewood, Victor 2 two weeks of effort to help review test plan and aid testers
Irving, Christopher 2 two weeks of SP testing
Deliverables:
Activity Deliverable Assignee Detail
Test Plan Shava, Victor, JP Test plan for how to verify SP resource integration
Test Report Shava Summary and recommendations for how to improve SP resource integration
Planned Launch Date:
Actual Launch Date:
Planned Test Readiness Review Date:
Actual Test Readiness Review Date:
Planned Complete Date:
Actual Complete Date:
Activity Lead: Shava Smallen
Lead Tester: Shava Smallen
Testers:
Christopher S Irving
Test Plan: https://software.xsede.org/svn/xci/activities/xci-006/trunk/Deliverables/XCI-6-TestingPlan.pdf
TRR Baseline: https://software.xsede.org/svn/xci/activities/xci-006/tags/TRR
Test Report: https://docs.google.com/a/ucsd.edu/document/d/1vZwJKW9gR6i8euvhtY3JoYDUPzSTDr2TkFcqtmae_Mg/edit?usp=sharing

 Description   

This is an evaluation and testing activity to analyze the current process of integrating a new resource. We will create a new virtual cluster on Comet and run through the current steps to both introduce a new Level1 Service Provider and a new resource and document everything that is complicated, confusing, or didn’t work and how it can be improved. We are looking for feedback on both the overall integration process and on the integration of individual components.



 Comments   

There are comments for XCI-6 that can be viewed with XSEDE authentication.