[#XCI-45] Prepare initial Group management requirements, use cases, and plans

[XCI-45] Prepare initial Group management requirements, use cases, and plans Created: 03/23/2017  Updated: 06/24/2020

Status: Closed
Project: XSEDE Cyberinfrastructure Integration
Component/s: CoManage Group Management Service
Fix Version/s: PY6 Increment B (Jan - Apr '17), PY7 (Sep '17 - Aug '18)

Type: XCI Engineering Analysis Priority: Major
Reporter: JP Navarro Assignee: Lee Liming
Resolution: Unresolved Votes: 0

Issue Links:
Relates
relates to XCI-257 Review of AARC's “Guidelines on expre... Closed
XCI Design
produces design for XCI-750 Group Management services CI integrat... In Progress
Sub-Tasks:
Key
Summary
Type
Status
Assignee
XCI-214 Consolidate group management use case... Sub-task Closed Lee Liming  
Target Operator:
Campus Resource Operators, XSEDE Enterprise Services, XSEDE End Users, XSEDE Science Gateways, XSEDE Service Providers
XSEDE Priority: -
Public activity link: https://software.xsede.org/display/xci-45
Devel Repository:
Show
https://software.xsede.org/svn/xci/activities/xci-045/trunk/
Use Cases:
GRP-01: Researcher manages membership of a project group, GRP-02: Manually create a group, GRP-03: Manually view or manage the configuration or membership of a group, GRP-05: Invite members to a group, GRP-06: Request membership in a group, GRP-09: Synchronize an external group, GRP-10: Automate a group's configuration, GRP-12: Use groups to control access within a resource, GRP-14: Use a group to control access within an application, GRP-15: Use a group for task assignments within an application, GRP-16: Use a group for email distribution, GRP-17: Drive project membership with an email message
Effort and Costs:
Staff Name (Lastname, Firstname) Effort (person weeks) Roles or Contributions Status
Liming, Lee 2 Lead engineering analysis none
Basney, Jim 0.2 Participate in engineering analysis none
Navarro, JP 0.2 Participate in engineering analysis none
Deliverables:
Due by Activity Deliverable
DSR Requirements Document
DSR Use Cases
DSR Capability Delivery Plans
Planned Launch Date:
Actual Launch Date:
Planned Design Review Date:
Planned Complete Date:
Actual Complete Date:
Activity Lead: Lee Liming Lee Liming
Lead Tester: Shava Smallen Shava Smallen

 Description   

Gather Group management requirements from key XSEDE groups and Science Gateways, and prepare use cases and capability delivery plans for UREP review.